Indianapolis, IN
This project consisted of the renovation of an Indy Parks aquatic center which included the replacement of the pool HVAC and dehumidification system, locker room bathroom stalls and fixtures; resurfacing of the locker room floors; construction of a manager’s office; installation of a new bleach tank; and painting of the pool ceiling, waterslide, railings, locker rooms, entrance lobby, doors, and office.